1. Introduce:
This document outlines the process of modifying active/reactive power on ShineMonitor platform.
ShineMonitor URL:http://hopewind.shinemonitor.com/index_cn.html?1625495564980
2. Steps to modify active/reactive power.
2.1 Log in to the ShineMonitor using your account.2.6 The active power setting involves the same process, first modify the regulation mode, and then set the value. Finally save the current parameters (Step 5).